国产区精品-国产区精品高清在线观看-国产区精品系列在线不卡-国产区精品一区二区-国产区精品在线2022-国产区连接精品

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 91精品导航在线观 | 91精品国产免费青青碰在线观 | av资源在线播放韩国 | 亚洲国产精品人人做人人爽 | 一区二区三区久久亚洲 | 国产成人精品亚洲一区 | 一级毛片一级毛片 | 精品日韩一区二区三区 | 国产午夜鲁丝片av无码免费 | 亚洲一区二区三区日本久久九 | 91九色国产社区在线观看 | 日韩成人一区二区三区在线观看 | 亚洲a级成人毛片免费高清无码视频 | 97视频hd免费在线观看 | 国产精品久久久久精品三级a | 欧美视频在线观看 | 欧美国产成人精品一区二区三区 | 中文字幕无码a片久久东京热喷水 | 99久久国产综合精品成人影 | 欧美一级两级三级在线看 | 免费一区二区 | 国产福利在线观看 | 亚洲精品在看在线观看高清 | 日韩亚洲欧洲美三区中文字幕 | 玩弄丰满熟妇xxxxx性 | 亚洲乱码中文字 | 男女猛烈无遮挡动态视频 | 免费又爽又黄禁片观看1000 | 亚洲人成无码网站 | 亚洲av无码国产精品色午夜 | 亚洲国产精品日韩av不卡在线 | 亚洲av永久无码嘿嘿嘿 | 国产精品日韩高 | 免费视频一区二区三区国产免费一区二区三区 | 成人激情视频在线观看 | 亚洲av天天做在线观看 | 在线精品国产一区二区三区88 | 18禁无码国内精品久久综合88 | 成人综合高清久久亚洲中文字幕精 | 无码专区久久中文字幕 | 日韩在线色欲一 |