国产区精品-国产区精品高清在线观看-国产区精品系列在线不卡-国产区精品一区二区-国产区精品在线2022-国产区连接精品

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 亚洲欧美日本国产综合在线 | 精品欧美成人高清在线观看观看视频 | 99视频在线精品免费观看6 | 中文字幕av专区无码不卡 | 99国产亚洲精品无码成人 | 2025国产精品亚 | 日韩久久精品无码av | 欧美疯狂做受xxxx高潮 | 国产目拍亚洲精品 | 办公室扒开奶罩揉吮奶头免费a片 | 国产免费av片在线播放 | 国产无遮挡裸露视频免费 | 99国产精品自在自线 | 国产精品亚洲第一区在线 | 伊人一区二区三区久久精品 | 午夜福利视| 国产精品亚洲电影久久成人影院 | 日韩欧美国产成人aⅴ一区二区 | 亚洲日韩精品一区二区三区高 | 亚洲国产成人精品女人久久久久久久18嫩草 | 6080神马电影| 日韩av一级毛片无码 | 国产在线观看无码免费视频 | 免费在线观看最新电影和电视剧 | 亚洲成人网在线观看 | 亚洲综合成人婷婷五月在线观看 | 丰满岳乱妇在线观看视频 | 夜色资源网 | 玩弄丰满熟妇xxxxx性 | 99国产在线精品视频 | 在线看片无码永久免费aⅴ动漫 | 午夜av内射一区二区三区红桃视 | 色与欲影视天天看综合网 | 制服免视频 | 国产精品一区二区三区四区五区上线网友表示 | 亚洲欧洲自拍拍偷综合 | 国产精品成人观看视频国产 | 99精品视频只有精品高清1 | 日韩欧美电影在线 | 婷婷精品一区二区三区视频在线 | 亚洲av中文无码乱人伦app |